ClinicalTrials.Veeva

Menu

Development of a New Critical Pathway for Treatment of Acute Bacterial Skin and Skin Structure Infections (ABSSSI)

Allergan logo

Allergan

Status and phase

Completed
Phase 4

Conditions

Acute Bacterial Skin and Skin Structure Infection
Bacterial Infections

Treatments

Drug: Dalbavancin
Drug: Usual Care

Study type

Interventional

Funder types

Industry

Identifiers

NCT03233438
CMO-US-ID-0528

Details and patient eligibility

About

The purpose of this study is to assess the effect of a new critical pathway (use of guideline-based patient identification criteria and for those who meet these criteria, use of dalbavancin) compared to usual care for the treatment of ABSSI (Acute Bacterial Skin and Skin Structure Infections)

Enrollment

91 patients

Sex

All

Ages

18+ years old

Volunteers

No Healthy Volunteers

Inclusion criteria

  • Admitted patients who meets the clinical definition for Acute Bacterial Skin and Skin Structure Infections (ABSSSI)
  • Known or suspected gram-positive infection.

Exclusion criteria

  • Known or suspected gram-negative infections, anaerobic infections, or fungemia
  • Known or suspected infections that are severe, life threatening or are not included in the ABSSSI Food and Drug Administration (FDA) guidance
  • Injection drug users with a fever
  • Severe neurological disorder leading to immobility or confined to a wheelchair
  • Bilateral Lower extremity involvement of the suspected infection.

Trial design

Primary purpose

Treatment

Allocation

Non-Randomized

Interventional model

Parallel Assignment

Masking

None (Open label)

91 participants in 2 patient groups

New Critical Pathway
Active Comparator group
Description:
The New Critical Pathway under study is defined as (1) use of guideline-based patient identification criteria, and, for those who meet these criteria, (2) use of dalbavancin, administered as a single intravenous (IV) dose of 1500 mg over 30 minutes for the treatment of ABSSSI.
Treatment:
Drug: Dalbavancin
Usual Care
Active Comparator group
Description:
Participants who receive Usual Care as prescribed by the physician as standard of care in clinical practice for the treatment of ABSSSI.
Treatment:
Drug: Usual Care

Trial documents
2

Trial contacts and locations

1

Loading...

Data sourced from clinicaltrials.gov

Clinical trials

Find clinical trialsTrials by location
© Copyright 2026 Veeva Systems