ClinicalTrials.Veeva

Menu

Evaluation of a New Critical Pathway for Treatment of Acute Bacterial Skin and Skin Structure Infections (ABSSSI)

Allergan logo

Allergan

Status and phase

Completed
Phase 4

Conditions

Acute Bacterial Skin and Skin Structure Infections

Treatments

Drug: Dalbavancin
Drug: Usual Care

Study type

Interventional

Funder types

Industry

Identifiers

NCT02961764
CMO-US-ID-0476

Details and patient eligibility

About

This study will evaluate a new critical pathway (use of guideline-based patient identification criteria and for those who meet these criteria, use of dalbavancin) for the treatment of ABSSSI compared to usual care.

Enrollment

313 patients

Sex

All

Ages

18+ years old

Volunteers

No Healthy Volunteers

Inclusion criteria

  • Presents to the Emergency Department (ED) and meets the clinical definition for Acute Bacterial Skin and Skin Structure Infections (ABSSSI)
  • Known or suspected gram-positive infection.

Exclusion criteria

  • Known or suspected gram-negative infections, anaerobic infections, or fungemia
  • Known or suspected infections that are severe, life threatening or are not included in the ABSSSI Food and Drug Administration (FDA) guidance
  • Injection drug users with a fever
  • Severe neurological disorder leading to immobility or confined to a wheelchair
  • Bilateral Lower extremity involvement of the suspected infection.

Trial design

Primary purpose

Treatment

Allocation

Non-Randomized

Interventional model

Parallel Assignment

Masking

None (Open label)

313 participants in 2 patient groups

Usual Care
Active Comparator group
Description:
Participants who receive Usual Care as prescribed by the physician as standard of care in clinical practice for the treatment of ABSSSI.
Treatment:
Drug: Usual Care
New Critical Pathway
Active Comparator group
Description:
The New Critical Pathway under study is defined as (1) use of guideline-based patient identification criteria, and, for those who meet these criteria, (2) use of dalbavancin, administered as a single intravenous (IV) dose of 1500 mg over 30 minutes for the treatment of ABSSSI.
Treatment:
Drug: Dalbavancin

Trial documents
2

Trial contacts and locations

11

Loading...

Data sourced from clinicaltrials.gov

Clinical trials

Find clinical trialsTrials by location
© Copyright 2026 Veeva Systems