ClinicalTrials.Veeva

Menu

Residual Extensor Lag Approximately 1 Month After Splint or Cast Immobilization of a Mallet Finger

Mass General Brigham logo

Mass General Brigham

Status

Withdrawn

Conditions

Patients Present With Mallet Finger

Treatments

Other: Likert Pain Scale
Other: Mallet Finger Extensor Lag Measurement
Other: PROMIS Upper Extremity

Study type

Interventional

Funder types

Other

Identifiers

NCT02210676
2014P001041

Details and patient eligibility

About

Aim:

The purpose of the study is to learn more about how a person recovers after treatment for mallet finger injury. The investigators want to identify the best outcome after mallet finger injury and how to improve treatment strategies.

Primary null hypothesis:

There are no statistically significant factors associated with extensor lag between 4 weeks and 4 months after immobilization is discontinued for a mallet finger among demographic, injury, and treatment factors.

Secondary null hypothesis:

There are no statistically significant factors associated with PROMIS upper extremity function between 4 weeks and 4 months after completion of immobilization for a mallet finger among demographic, psychological, injury, and treatment factors.

Sex

All

Ages

18+ years old

Volunteers

No Healthy Volunteers

Inclusion criteria

  • 18 years of age and older
  • English fluency and literacy
  • Mallet finger fracture or non-fracture
  • Mallet finger subluxation or non-subluxation

Exclusion criteria

  • Pregnant Women

Trial design

Primary purpose

Health Services Research

Allocation

N/A

Interventional model

Single Group Assignment

Masking

None (Open label)

0 participants in 1 patient group

Patients with Mallet Finger
Experimental group
Description:
All enrolled patients
Treatment:
Other: PROMIS Upper Extremity
Other: Likert Pain Scale
Other: Mallet Finger Extensor Lag Measurement

Trial contacts and locations

1

Loading...

Data sourced from clinicaltrials.gov

Clinical trials

Find clinical trialsTrials by location
© Copyright 2026 Veeva Systems